Production Day 1!

     Today we began production of our film. The day was very successful as we got more than enough shots to begin editing the project. I am overall proud of how well we worked together and how the footage came out. While filming so many strange things happened which helped continue the unedited vibe the film is meant to have. My hat flew in the lake, and we even met these random guys in a truck while filming in the Everglades who helped us with the project. We informed them prior to filming of what we were doing and they were more than happy to help us with the project.

    So as of now we only need to film the night time scenes. This will be the most challenging part of the project as it will take extra actors and to start a fire. We plan to film it later in the week and begin editing this weekend. Editing will not take that long due to the project's vibe to be unedited.  Later on this week I will post clips from filming so you guys can see how its coming along.

Sunday, March 20, 2022

Shooting Schedule

 Shooting Schedule:

MONDAY 3/21/22- 1:30 PM - 4 PM

(Teens getting equipment ready and adventuring into everglades, shots when the kids arrive)


TUESDAY 3/22/22 - 12 PM - 5 PM

(SCENES OF THE KIDS EXPLORING THE EVERGLADES/ POSSIBLE NIGHT SCENES TBD)


WEDNESDAY 3/23/22- 6 PM - 10 PM

(NIGHT SCENES)

 

THURSDAY 3/24/22

MAKEUP FOR ANY SCENES NEEDED


This is a rough draft of our shooting schedule for the upcoming week. This is subject to change if emergencies occur. The times may go on a bit longer than expected or shorter we just need to see how the day and scenes unfold. Also, we may perfect the shots first try and be able to reduce the amount of shooting days needed.

Saturday, March 19, 2022

Spring Break/Filming

     Due to Spring Break beginning and us having a long period of time off we decided to take advantage of this time. Due to many past complications we are delayed on the production process. Essentially, we need to work faster in order to finish the project by the due date. We planned to meet Monday morning at my house in order to begin production. We will film the day scenes, or the latter part of the opening. Here is our conversation discussing when we will start production.

We overcame a quick obstacle due to one of our members having work in the morning however we decided to film after he gets out of work. Later on we plan to make a shooting schedule in order to give us a general idea of what shots we will film everyday in order to finish the movie.







Thursday, March 17, 2022

Graphics

     As discussed previously, we are taking heavy inspiration from The Blair Witch Project. In class we sat down and began creating the intro graphics needed for the project. We first tried using canva or photoshop but found it too difficult. One of out group members proposed we use the powerpoint in order to create the graphics. This was a lot easier due to us all being comfortable with the software, and how it works. Here are the graphics:


    These graphics are placed about 30 seconds into the film opening after the climax is briefly show to provide context for the viewers on what is currently happening.


Sunday, March 13, 2022

Quick Road Bump!

     Our group previously planned to begin production today, March 13 however it did not go as planned. Due to me and my partner Ben Stone getting called into work we were not able to fit in the time to begin production this week. This really set me back as we really need to begin production due to the due date coming up soon. We communicated amongst each other and planned to film another day. 

    So many conflicts and issues have been thrown our way so far and we overcoming them as a team. We plan to film some time this week and utilize spring break as time to film due to none of my team members leaving on vacation. This project has improved my team working skills as I am learning to accommodate other people and work around everyone schedule.

Editing

     When editing our project we plan to take an interesting approach. To keep up with the raw footage/lost tapes idea we plan to use as little editing as we can to keep the idea alive. Since the film needs to be as raw as possible simple jumpcuts and transitions to move the plot along from the climax to the introduction. Simple graphics will be added into the film such as the "Warning" graphic. This graphic is inspired by this photo.


Our warning graphic will emulate this one however the text will be differently as it applies to our film. This graphic is from The Blair Witch Project, as this movie serves as a massive inspiration. The graphic will be displayed for a few seconds and will be transitioned to the beginning of the film via a fade transition.


Friday, March 11, 2022

First Production Date Decided!

     After multiple attempts to schedule a day of production, we finally settled on a time to begin production. We are a little behind on the production schedule meaning we need to work even harder to ensure we finish by our expected date. We communicated via Snapchat and decided to begin production Sunday March 13th around 7pm.

We are planning to film the introduction to the film (the scenes at night). This is going to be the hardest part of the film introduction to film as it requires the most actors and misc en scene elements as it is the climax as of the film. Im very excited to see how the project comes out.


Film Intro

 This is the link to our film opening: https://youtu.be/HiDBIQBOcpo